Special request for EESIFLO Clamp on Flowmeters to undergo testing at a third party calibration facility on different sized pipes

Contractor's Photo . They requested for emergency replacement of worn out flowmeters on a Crude oil line by clamping on EESIFLO explosion proof Ex meters
Combined agent/customer training seminar held at a convenient local hotel
Installation team hard at work on multiple installations in an HVAC system. Fixed meter installation flow velocities were verified at each point by trained instrumentation engineers. Multiple installations required our work force to install all the meters before the client deadline
Installation of Fixed clamp on meters for cooled water verification at a shopping mall. Insulation was removed and replaced without damaging the process.

Flow surveys conducted for a water works company to verify their existing magmeters were functional.
Multiple locations required a fast moving team and reliable flow meters
Send mail to sales@eurogulfco.com for additional information. Copyright © 2003 EURO GULF GROUP CO.